photos : key

Up



base-on-granite


key-base-1

12/24/05 -- The base is done, except for the bevel around the front and sides. It's still in the vise on the mill waiting for that. The finish looks grooved. It isn't. That's the result of taking a small (.005) cut in the mill. I like it.

key-pieces1

12/24/05 -- This is most of the pieces-parts. The fixed contact pieces are in the top right, and the thing that looks like a brass screw is the moving contact.Once the arm is polished, the ball bearings will be pressed onto the pivot shaft, and the whole thing test-fitted.

layout1


mockup1


mockup2


mockup3


Album created by album tool a script written by David Ljung Sun Aug 16 19:30:17 2009